How Long Does a Kitchen refurbishment Take in Margate?

A kitchen refurbishment in Margate typically takes 4–9 weeks on site once we start. That's the build phase only — design, planning approval, building regs and material lead-times add roughly 4–8 weeks before a spade goes in.

How Long Does a Kitchen refurbishment Take in Margate? — example of stairs work by Tembok in Margate

Get a Margate quote

Free site visit. Itemised written quote in 5 working days.

Get My Free Quote

Reply within 24 hours · No obligation

Or call 07453 261303

Week-by-week programme for Margate

This is the standard Gantt we issue with every Margate kitchen refurbishment contract. You'll see each week's milestones in writing so progress is unambiguous.

  • Weeks 1–2: Strip out, set up, structural opening up
  • Weeks 3–2: Foundations / shell / structural
  • Weeks 3–7: First fix M&E, glazing, weathertight
  • Weeks 8–8: Second fix, joinery, plastering, tiling
  • Final week: Snagging, building control sign-off, handover

What slows a Margate project down

Margate's conservation requirements and the lead-time on heritage materials (peg tiles, oak, lime mortar) are the two biggest sources of delay we see. We pre-order long-lead items before we start on site to keep the programme.

  • Conservation officer requesting material samples (add 1–2 weeks)
  • Bespoke joinery lead-times — typically 4–6 weeks from sign-off
  • Engineer revisions if structural assumptions change once opened up
  • Client decision delays on finishes (we set a "lock-by" date per stage)

In short

4–9 weeks on site for a kitchen refurbishment in Margate, plus design and planning lead-time. Every project gets a written week-by-week programme up front.

Programme questions we get from Margate

Can a kitchen refurbishment in Margate be done faster than 4 weeks?

Occasionally — small straight refits with no structural change can run shorter, but we don't quote unrealistic programmes to win work. A 4-week minimum is what we deliver to.

Do you work on site every day in Margate?

Monday to Friday 7am–5pm, Saturday morning when programme needs it. Margate's residential conservation areas have noise restrictions we comply with.

What happens if you run over the programme?

Contract has liquidated damages clauses on programme slip caused by us. Weather and client variation changes are flagged in writing as they happen so the programme stays accurate.

Can we live in the house during a kitchen refurbishment in Margate?

For loft conversions and most kitchen / bathroom refits — yes, with one room out of action at a time. For full house extensions opening up the back of the property, moving out for 4–6 weeks is usually easier.