New Builds in Kent

Ground-up new homes — groundworks, frame, roof, services and fit-out — built to a domestic finish standard.

What's Included

New Builds — The Tembok Way

A one-off new build is shaped by its plot, from the lorry access and the ground beneath to the route services take to the door.

  • Foundations & groundworks
  • Timber or block construction
  • First & second fix
  • Landscaping handover

Reading the plot before drawing the house

Access for deliveries, the slope of the land, trees, neighbours and existing services all decide what can realistically be built. Planning permission comes before anything else, and conditions attached to it can affect materials, landscaping and the order of work.

A plot with tight access may favour materials that arrive in smaller loads or a frame that goes up quickly.

Ground conditions set the foundations

Clay, chalk, sand and made ground each behave differently, and trees close by can draw moisture out of clay. A ground investigation and the engineer's design decide between strip, trench fill, raft or piled foundations.

Timber frame or masonry walls

A timber frame goes up quickly and reaches a weathertight stage sooner. Masonry offers thermal mass and suits a traditional build. Both can meet current standards; the choice often comes down to programme, budget and the look of the finished house.

  • Timber frame: fast to the dry shell, lighter on foundations
  • Masonry: heavy, solid and familiar to local planners
  • Either can be finished in brick, render, tile or cladding

Services, inspections and the build sequence

Water, electricity, drainage and broadband connections are applied for early, because utility companies work to their own timetables. Building control inspects at key stages such as foundations, drainage and completion.

The house is taken to a weathertight shell first: frame or walls, roof, windows and doors. Fit-out follows inside: first fix, plastering, second fix, kitchens, bathrooms and decoration.

What decides the budget for a single new house

Plot and specification usually decide more than floor area.

  • Site access and how materials reach the plot
  • Ground conditions and foundation type
  • Timber frame or masonry construction
  • Distance to mains services and connection charges
  • Planning conditions on materials or landscaping
  • Heating system and specification of finishes

Recent New Builds Projects

New Build Foundations

New Build

New Build Foundations

Pad foundations and groundworks for a new residential build — site clearance, excavation and concrete pads.

Across Kent

New builds in Kent

We build new homes across Kent from foundations to handover — groundworks, frame (timber or block), roof, weather-tight envelope, first-fix services, second-fix joinery, decoration and external landscaping. Domestic-quality finish from a small directly-employed team, not a volume housebuilder spec.

Most new-build projects in Kent involve close coordination with the planning authority (often Tunbridge Wells, Ashford or Sevenoaks for our patch) plus building control, structural engineer and SAP assessor. We coordinate all of them as part of one contract.

Typical Kent new-build: 9–14 months from groundworks to handover for a single detached home, depending on size, specification and weather windows.

FAQs

New Builds — frequently asked

Do you build to Passivhaus or AECB standards?

Yes — several recent projects have targeted EnerPHit retrofit, AECB Silver and full Passivhaus. We'll quote against your preferred standard with the right design partners.

Can you handle the plot purchase and planning gain?

Plot assessment and pre-application planning yes; we don't act as land agents but we work alongside local planning consultants where outline consent is needed.

What's the typical build cost for a one-off new build?

£2,400–£3,200 per m² for a quality timber-frame finish (2026 prices); £3,200–£4,500+ for masonry with high-spec joinery and finishes.

How long does a single-plot new build take?

12–18 months on site from groundworks to handover, depending on size and finish. Add 4–8 months for design and planning before that.

Do you provide structural warranties?

Yes — Premier Guarantee or LABC Warranty 10-year cover is standard. We coordinate the inspections and snag list as part of handover.

Can you build on a slope?

Yes — sloped sites need engineered retaining and stepped foundations but are well within our scope. We've completed builds with 3m+ level changes.

Can a new build be sited to make the most of the sun?

Often, within the limits of the plot and planning. Orientation affects daylight, heat gain and where living rooms are placed, so it is considered at the design stage.

Should a new build be timber frame or masonry?

Both work. Timber frame reaches the weathertight stage sooner; masonry gives thermal mass. Programme, budget and appearance usually decide.

When should service connections be applied for?

As early as possible, because utility companies work to their own timetables.

Who decides the foundation type for a new house?

A structural engineer, based on the ground investigation and nearby trees, with building control approval.