
Tembok Carpenter & Building Services
Design & Planning in Kent
In-house design and planning service — drawings, applications, structural calcs and party wall agreements coordinated for you.
What's Included
Design & Planning — The Tembok Way
Design and planning turns an idea into drawings a builder can price and building control can approve.
- Architectural drawings
- Planning applications
- Structural calculations
- Party wall agreements
Measuring what is already there
A measured survey records the existing house accurately, including levels, wall thicknesses and roof heights. Every later drawing builds on it, so mistakes here carry through.
Options, then drawings
Early sketches test different layouts before committing to one. The chosen option becomes planning drawings, then more detailed building regulations drawings.
Which approval does the project need
Some projects need a planning application; others may fall under permitted development, where a lawful development certificate can confirm the position. Building regulations approval is usually needed either way.
- Planning application or lawful development certificate
- Building regulations approval
- Structural calculations from an engineer
- Party wall notices where neighbours are affected
Why design and build keeps drawings buildable
When the people drawing the job also build it, details are planned with construction in mind. That helps avoid drawings that look good but are hard or costly to build.
It also means the fixed-price written quote is based on drawings the builders already understand.
Talking to neighbours and the council
A brief chat with neighbours before an application goes in often avoids objections later. For larger or sensitive schemes, the council may offer pre-application advice, which can flag concerns before a full application is prepared.
Planning decisions take time, so building regulations drawings and engineering are often prepared while the application is being considered.
When the drawings meet the site
Once work starts, small differences between the drawings and the real building are normal in older houses. Having the design and the build in the same hands means these can be resolved on site quickly, without waiting for drawings to be passed between separate firms.
What affects design and approval costs
Project complexity and approvals needed set the cost.
- Size and complexity of the scheme
- Planning application or lawful development route
- Building regulations drawing detail
- Structural engineer's input
- Party wall procedures
- Listed building or conservation area requirements
Guides
Useful Design & Planning guides
- Removing walls and structural alterations: what actually happens
- Kitchen extensions: layouts, structure and planning
- Ground floor extensions: options, planning and what to decide first
- Two storey and multi-storey extensions: planning and build
- Householder planning applications explained
- L-shaped extensions: is one right for your house?
- Wrap around extensions: what they are and when they make sense
- Integral garage conversion: turning a garage into living space
- Velux loft conversions: how a rooflight conversion works
- Loft conversion process: what to expect stage by stage
- Property extensions: types, planning and what to expect
Across Kent
Design and planning in Kent
Tembok's in-house design and planning service covers the paperwork most homeowners hate: scaled architectural drawings, planning applications, building regs submissions, structural engineer's calculations and party wall agreements — coordinated for you under one fee.
We work daily with the Kent planning authorities — Tunbridge Wells, Ashford, Maidstone, Sevenoaks, Canterbury, Medway and Folkestone & Hythe — so we know each council's interpretation of permitted development, neighbour-consultation timing and conservation-area constraints.
Engaging us at design stage also means the drawings are buildable from day one. Most homeowners save the difference between our design fee and a separate architect-plus-builder route, because there's no re-detailing once tenders come back.
Areas covered
Design & Planning across Kent & East Sussex
FAQs
Design & Planning — frequently asked
Can building regulations drawings be prepared while planning is pending?
Yes. Many projects prepare building regulations drawings and engineering while waiting for a planning decision, which helps the build start sooner.
What is a lawful development certificate?
A document confirming that a project falls within permitted development, which can help when selling the house later.
Do I need building regulations drawings as well as planning drawings?
Usually yes. Planning drawings show appearance; building regulations drawings show how it is built.
Why is a measured survey needed?
It records the existing building accurately so new drawings and structural designs fit what is really there.
Let's Talk
Ready to Get Started?
Get in touch for a free, no-obligation quote on your next project.
