Whole-house renovations including layout reconfiguration, insulation upgrades, joinery, decoration and finishing.
What's Included
A whole-house renovation is run in the order the building needs it, structure and weather first, then services, then the finishes you see.
Before a room is designed, the house itself is assessed: the roof, the structure, damp, drainage, wiring and heating. That picture decides what must be done, what can wait and what order makes sense.
New finishes inside a house with a leaking roof or failing lintel are at risk from the start. Structural repairs, roof work and windows are tackled first, so the building is sound and dry.
Older houses hold surprises: rotten joist ends, old lead pipe, cabling that needs replacing. Contingency is planned into the programme so decisions can be made quickly and the work keeps moving.
Work can be phased so one part of the house stays usable while another is stripped. Dust screens and a working bathroom make that possible.
Older solid walls need insulation and ventilation in balance; sealing them with the wrong materials can trap moisture. We check the construction and choose materials to suit.
Sockets, radiator positions, lighting circuits and the location of the boiler are far cheaper to settle before plastering than after. Walking each room with the drawings, imagining where furniture will sit, catches most of these. Late changes to finished rooms are the main reason a renovation drifts, so choices about kitchens, bathrooms and flooring are best fixed early and ordered in time for each stage.
Scope and condition, more than size alone, set the cost.

Renovation
Polished Venetian plaster feature wall with gold leaf detailing, applied as part of a full living room renovation.
Guides
Across Kent
Whole-house renovations are where Tembok adds the most value — one written contract covering structural work, layout reconfiguration, insulation upgrades, joinery, plumbing, electrics, plastering and decoration. No project-managing trades yourself.
Across Kent we handle period restorations on Wealden cottages, 1930s semi refurbs in Maidstone and Sevenoaks, and full strip-and-rebuild jobs on inherited properties. Heritage detail (lime mortar, oak frame repair, sash joinery) is handled in-house.
Typical Kent whole-house renovation runs 4–9 months on site depending on whether you stay in or move out, and whether structural elements (RSJs, layout changes, extensions) are bundled in.
Areas covered
A home renovation does not have to replace everything. Start with a room-by-room list of what works, what is worn out and what gets in the way. Sound kitchen cabinets may be worth retaining while the doors, worktop and layout change. In a bathroom, the position of the waste pipe can influence whether moving the shower is worthwhile. Distinguishing repairs from replacement gives the refurbishment a clear brief before finishes are chosen.
Look beyond individual rooms when a house renovation includes several trades. A kitchen renovation, bathroom refurbishment and rewire can share access routes and opening-up work, but each needs a clear sequence. Structural alterations come before finished surfaces; plumbing and electrical routes are agreed before plastering; fitted joinery is measured against the space that will actually remain. Discuss which rooms need to stay usable while those stages take place.
House renovation cost depends on more than floor area. Ask whether the written scope includes stripping out, making good, waste removal, decoration and connections as well as the visible fittings. A bathroom renovation with retained pipe positions is a different brief from moving everything across the room. The same applies to a kitchen refurbishment that includes a knock-through. Mark optional items separately so decisions can be made without confusing the essential work with a later upgrade.
FAQs
Most projects yes, with room-by-room phasing. Full strip-outs (joists up, services rerun) usually need a 6–8 week move-out for safety and programme efficiency.
Every quote carries a 10% contingency line. Surprises get costed against it and signed off in writing before we proceed — no verbal scope creep.
Both — we have in-house design and external architect partners. Most clients use our design service for cost certainty; some bring their own architect, which is also fine.
£1,500–£2,500 per m² for a quality finish (mid-2026 figures), £2,500–£4,000+ per m² for high-end specification with bespoke joinery and premium materials.
Realistic programme is 6–9 months on site, depending on whether the works include structural alterations and the spec level of joinery, kitchens and bathrooms.
Yes — we have heritage joiners and plasterers on the team and existing relationships with Conservation Officers in TWBC, ABC and Maidstone.
Yes. Identify sound items during the survey and agree what can remain. Retained fittings need to be considered alongside the new layout and access for repairs.
They can be treated as one refurbishment brief, with plumbing, electrical work and finishes sequenced across both rooms. Agree how essential facilities will remain available during the work.
As far as possible. Settling kitchens, bathrooms and flooring early lets them be ordered in time and avoids delays.
Usually structure, roof and damp, then services such as wiring and heating, then plastering and finishes.
Yes, with materials that suit the wall construction and good ventilation. We check the walls before recommending an approach.
A survey of the building's condition helps decide the order and scope of work, and avoids finishing rooms that later need opening up.