Tembok Carpenter & Building Services logo
House Extension Checklist for Tunbridge Wells Homeowners — example of joinery work by Tembok in Tunbridge Wells

House Extension Checklist for Tunbridge Wells Homeowners

Most Tunbridge Wells homeowners commissioning their first house extension don't know what "good" looks like — and that's fair. A house extension is a five- to six-figure decision made once every 10–20 years, with 3 quotes that all look reassuring on the front page.

This checklist is the one we hand Tunbridge Wells clients on the first site visit. It covers everything to sort before you sign, what to look for in a written quote, and the contract clauses that separate a professional builder from a hopeful one.

Use it against every quote — ours included. If a builder can't answer the top-line questions here, don't sign with them.

Before you request any Tunbridge Wells quote

Sort these five things first — you'll get much more accurate quotes and shorten the whole process by weeks.

  • Rough scope: rooms affected, must-haves, nice-to-haves in writing
  • Rough budget band — £X to £Y, all-in — so builders can spec to it
  • Site access: parking, skip location, working hours you can accept
  • Planning status: existing PP, PD certificate, or fresh application needed?
  • Timing: earliest start month, any hard deadlines (baby / wedding / school year)

Quote-comparison checklist — line-by-line

The written quote should let you compare like-for-like across 3 builders. If it doesn't include every one of these, ask for it in writing before signing.

  • Itemised cost by trade (not a single "labour and materials" number)
  • Written spec: make, model, finish for every fitting
  • Kitchen / bathroom / sanitaryware supply — included or PC sum?
  • Programme with week-by-week milestones
  • Payment schedule tied to stage completion, not calendar dates
  • Public liability and employer's liability insurance certificates
  • Workmanship warranty terms (min 5 years) — in writing
  • Contingency line, held back — not spent unless needed
  • VAT status and split (reduced-rate lines flagged if applicable)

Contract clauses that protect you in Tunbridge Wells

Once you've picked a builder, the contract is where you get protected — or not. These clauses should be in every Tunbridge Wells house extension contract.

  • Liquidated damages on programme slip caused by the builder
  • Retention (typically 5%) held for 6 months against snags
  • Change control — variations in writing before work proceeds
  • Dispute resolution route (mediation before litigation)
  • Termination for cause on both sides (not just the builder's)
  • Copy of the JCT Minor Works Building Contract or equivalent

Red flags on a Tunbridge Wells quote

Any of these should stop you signing until you've had a proper explanation in writing.

  • Deposit above 15% — nobody legitimate needs half up front
  • "From £X" pricing — real quotes are fixed, not open-ended
  • No insurance certs offered voluntarily with the quote
  • No previous-client references you can call
  • No mention of building regs / planning obligations
  • Vague "PC sums" for major line items (kitchen, sanitaryware)

Free Tunbridge Wells house extension site visit — bring this checklist

We'll walk your project against every checklist item at the site visit. If any answer isn't clear, we work through it before you commit.

Tunbridge Wells design FAQs

How many Tunbridge Wells builders should I get quotes from?

Three is the sweet spot — enough for meaningful comparison, few enough to stay organised. All three should be local (17 miles (~35-minute drive) radius) so distance loadings and site-visit friction are comparable.

What's a reasonable deposit in Tunbridge Wells?

10% on contract signing is standard. Anything over 15% is a red flag — the builder should have working capital for materials until the first stage payment.

Should I use a JCT contract or the builder's own?

JCT Minor Works or JCT Home Building Contract — both are industry-standard, fair to both sides, and cheap to buy. A builder-drafted contract usually skews toward the builder.

Who signs off building control at the end of my Tunbridge Wells house extension?

Either Tunbridge Wells Borough Council's Building Control team or an Approved Inspector. The final certificate is a legal document you'll need if you ever sell — keep it filed with the deeds.

Nearby areas we also cover

In short

A house extension in Tunbridge Wells goes well when the pre-build, quote-comparison, contract-clause and red-flag checklists are all sorted before you sign. Bring this checklist to every quote — including ours.

CallWhatsAppQuote