Tembok Carpenter & Building Services logo

By audience

What to expect on your first renovation

First-time renovator wanting to understand how the project will actually run.

First-time renovation project mid-way through structural works

Most first renovations go wrong not because the wrong tiles were chosen but because decisions were made in the wrong order. Structure and services come first, decoration comes last, and almost every regret we hear about traces back to that sequence being skipped.

This is a description of how a typical first project runs from survey to snagging, so the shape of it is familiar before your own starts.

The survey and scoping stage comes before any spending

Before any material is ordered, the building needs a proper look: roof, damp, structure, services condition and what is actually behind the walls you plan to move. On an older house this stage regularly turns up findings that change the brief, and it is far cheaper to absorb that change on paper than after a wall has already been opened.

Treat this stage as time well spent rather than a delay. A written scope at the end of it, covering what is structural, what is cosmetic and what depends on what, is worth more than any number of Pinterest boards.

Structure and weathertightness happen while the house is at its most exposed

If a wall is coming out, a roof is being renewed or an opening is being formed, that work happens first, while dust sheets and disruption are already unavoidable. Doing it later means reopening finished rooms to fix something that should have been dealt with at the start.

This stage is also when services get moved. Rewiring, replumbing and repositioning radiators while walls are already open avoids paying twice to chase the same plaster.

Trades arrive in a fixed order, not a flexible one

First fix electrics and plumbing go in before boarding and plastering. Flooring generally goes down after the ceiling and walls are finished but before fitted furniture, because cabinetry is scribed to the floor that is actually there, not the one drawn on a plan.

Kitchen and bathroom fitting comes near the end of the programme, once the room around it is finished, so units aren't damaged by other trades still working nearby.

Living on site changes what a realistic programme looks like

Kitchen out of use
Typically the longest single disruption; plan a temporary setup
One bathroom off-line
Manageable if a second is available; harder in a single-bathroom house
Dust and noise
Concentrated during structural and first-fix stages, tails off after plastering
Access for deliveries
Agree parking and unloading points before the first skip arrives

Snagging and handover close the project properly

A period of a few weeks after practical completion, where doors are eased, silicone joints checked and any minor defects listed and fixed, is normal and expected rather than a sign anything went wrong. Materials also move slightly as the house settles back to normal humidity, and small cracks or gaps can appear that weren't visible on the day of handover.

Ask for a written snagging list rather than relying on memory, and agree a date by which outstanding items will be closed off.

Common questions

How long does a first renovation usually take?+

It depends entirely on scope, but a whole-house renovation involving structural work, a rewire and new kitchen and bathroom commonly runs several months once the survey and design stage is included. A single-room refit is much quicker.

Can I live in the house during the work?+

Often yes, especially if work is phased room by room, but a full rewire or major structural stage makes some rooms unusable at times. Discuss phasing with your contractor if staying put matters to you.

Should I choose finishes before or after the layout is agreed?+

After. Tile and worktop choices that arrive before the layout is fixed frequently don't fit the space that's finally agreed, and money spent on them is wasted.

Book a free survey before you plan your renovation

We'll walk the property with you and set out a realistic scope and sequence before you spend on anything.

Ready to price your by audience in Kent?

Free site visit, fixed-price written quote and a 5 year workmanship guarantee — backed by 40+ years on the tools and our workshop in Biddenden.

Get your free quote

Reply within 24 hours · No obligation

What's the job?

  • 40+ years' experience
  • 5 year workmanship guarantee
  • Free site visit
  • Fixed-price written quote

Call 07453 261303 — speak to Malcolm, not a call centre

"We had our loft insulated and boarded. From start to finish the process was smooth, professional and stress-free. Malcolm upgraded the insulation and …"

Annette Eva, TN17 · 5★ Google review
CallWhatsAppQuote